top of page
Cherry Convertible Teardrop Trailer

1.JPG

2.JPG

3.JPG

4.JPG

5.JPG

6.JPG

9.JPG

11.JPG

13.JPG

14.JPG

16.JPG

17.JPG

18.JPG

19.JPG

22.JPG

23.JPG

24.JPG

25.JPG

27.JPG

28.JPG

29.JPG

30.JPG

32.JPG

35.JPG
The parts are all cut out and ready for finishing.
Trailer is assembled, floor is undercoated, vinyl is glued to floor.
Air Conditioner is test fit for mounting in the lower galley bulkhead.
Assembly of the camper is started after the parts are all finished and are dry.
Our new solid hatch design starts to take shape.
The new solid hatch is watertight and has 2 new locking handles installed.
The doors are installed and we are working on the final touches such as A/C trim,
curtains, and soon the convertible top will be installed.
bottom of page