top of page
Cherry Convertible Teardrop Trailer
floor7.JPG
parts for spray 7.JPG
side sprayed 7.JPG
side 7.JPG
sides up 7.JPG
shelf bulkhead 7.JPG
The floor and trailer start to take shape
Parts are sprayed and ready for assembly and the cherry is looking great
shelf 7.JPG
ribs3 7.JPG
ribs2 7.JPG
shelf folded 7.JPG
ribs1 7.JPG
screen 7.JPG
Roof ribs, shelf, and bulkheads are installed
Screen top is ready for trim
hatch sprayed 7.JPG
hatch 7.JPG
curtains 7.JPG
doors7.JPG
srceen doors 7.JPG
jack 7.JPG
cherry7side.JPG
The hatch is assembled, sprayed, and installed
The doors and curtains are next
Stabilizer jacks and trailer lights mean we are almost ready to roll
bottom of page